Overhead Clearance Specialists

High Load Scoping & Line Lifting

Height threshold assessment and electrical line lifting coordination for loads that need to pass under overhead infrastructure.

Powerline & Utility Height Verification

Every overhead line on your route measured and confirmed against load height.

Escort Height Pole Operations

Height poles run ahead of the load to confirm clearance in real time.

Utility Provider Coordination

Authorised contractor status with both Ergon Energy and Energex.

High-Clearance Vehicle Transit

Loads between 4.6m and 5.5m+ managed under our height threshold compliance process.

Height Measurement Equipment

Height pole and measuring equipment confirm clearance before the load reaches each obstruction.

Our Fleet & Field Operations

Frequently Asked Questions

Loads above roughly 4.6m start to interact with overhead infrastructure; the exact threshold and response depends on your load height and the specific route, which we confirm during scoping.

Yes, we are an authorised contractor for both Ergon Energy and Energex for line lifting and coordination.

We plan lifts well ahead of the move and coordinate directly with the utility provider so this is resolved before moving day, not during it.

Ready to Move Your Next Load?

Contact our dispatch team today for route planning and instant quote estimates.